
Doc
#
E154713
3-10
3: Hardware Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
6. With one hand on the front panel and the other on the digital board, carefully sep-
arate the front panel from the digital board.See Figures 3.8 and 3.9.
Figure 3.8: Holding the Front Panel and Digital Board
Figure 3.9: Separating the Front Panel from the Digital Board
Summary of Contents for Shark 100T
Page 1: ...V 1 04 May 15 2018 ...