
Doc
#
E154713
12-7
12: Test Mode
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
7. Make your selection and click Continue. The Test Mode screen is redisplayed, with
the current reading source reflecting your selections.
8. If you want to set Energy Presets, click Close to close the Test Mode screen (Test
Mode will still be active) and continue to step 9. If you do not want to set Energy
Presets, once you are done with Test Mode, click Exit Test Mode. You will see a
message that the meter is exiting Test Mode and then Test Mode will stop. Note
that the timeout value that you set up in Test Mode Configuration in the meter’s
Device Profile (see Section 11.2.11 of the
Communicator EXT
TM
4.0 and MeterMan-
ager EXT Software User Manual
for instructions on setting the timeout value and
Section 12.4 for more information on Test Mode timeout) will cause the meter to
exit Test Mode after a certain amount of time with no activity, even if you do not
actively exit Test Mode.
Summary of Contents for Shark 100T
Page 1: ...V 1 04 May 15 2018 ...