
Doc
#
E154713
3-8
3: Hardware Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3.4: Replacing the Meter’s Battery
This section gives instructions for replacing the meter’s Lithium battery.
CAUTION!
All personnel opening the Nexus® 1500+ meters are required to be
aware of the ESD threat to the electronic components and are required to maintain
ESD prevention measures.
You will need the following tools for the job:
• Ultra-grip static-dissipative screwdriver Phillips round blade, #1 tip, 3-1/8" blade
length
• Phillips power bit 1/4" hex shank, tip #1, 2" length
• Torque set screw driver: torque settings on drill 10in-lbs.
• ESD rigid plastic tweezers, 4 1/2".
• Battery insertion tool: 3 1/4” width x 3” length, non-conductive plastic.
• Non-metallic latex gloves.
NOTE:
Save all hardware (screws, washer, etc.) during disassembly, as it will be
needed during the reassembly of the unit.
Figure 3.6: Location of Meter Screws
Phillips pan head
screws
(2 per card)
Flat head screws connected
to front panel (8 total)
Summary of Contents for Shark 100T
Page 1: ...V 1 04 May 15 2018 ...