Controller Type
Connection Type
Connection Example
Page Reference
Gx-IC7
NPN
see
Gx-IC7
PNP
see
.
Gx-IC10 or Gx-OEM
NPN
see
Gx-IC10 or Gx-OEM
PNP
see
.
3. Select
Home > Setup > Production line setup > Line movement
.
4. Select a
Print group
tab, to choose which print group to setup.
5. Select the
Encoder input
setting and select
External - 1 Photocell
.
End of procedure.
2 PHOTOCELL ENCODER SETUP
WARNING
Hazardous Chemicals. Risk of eye and skin damage.
Wear protective equipment such as gloves and glasses when near the
printer.
Contact with chemicals can cause skin or eye damage.
Refer to Safety Data Sheet.
When the leading edge of a product passes the first photocell on the production line, the
photocell sends an input to the controller. A second input is sent to the controller when the
leading edge of the product passes the second photocell. The the distance between each
photocell is saved in the controller's settings. The controller uses the calculation below to
identify the production line speed:
INSTALLATION
77
EPT053091 - Issue 5 - 07 May 2021
Summary of Contents for Gx-OEM
Page 1: ...Gx Series Product Manual Gx150i Gx350i Gx OEM ...
Page 63: ...3 Install the faceplate End of procedure INSTALLATION EPT053091 Issue 5 07 May 2021 58 ...
Page 65: ...3 Install the faceplate End of procedure INSTALLATION EPT053091 Issue 5 07 May 2021 60 ...
Page 122: ...The illustration below shows the Setup screen OPERATION 117 EPT053091 Issue 5 07 May 2021 ...
Page 197: ...EPT053091 Issue 5 07 May 2021 192 ...