7. Select
Backlash direction
drop down setting, to select which direction the shaft encoder
will detect as forward:
Backlash Direction
Explanation
A leads B
Forward movement will be detected when the shaft encoder turns
clockwise.
B leads A
Forward movement will be detected when the shaft encoder turns
anti
‑
clockwise.
End of procedure.
EXTERNAL SHAFT ENCODER SETUP/CALIBRATION
WARNING
Hazardous Chemicals. Risk of eye and skin damage.
Wear protective equipment such as gloves and glasses when near the
printer.
Contact with chemicals can cause skin or eye damage.
Refer to Safety Data Sheet.
1.
Notes
Set the encoder mode, before calibrating the other encoder settings. When
changing the encoder mode, the encoder calibration settings can be lost.
External Shaft Encoder Mode Setup on page 71
.
2. To use an external encoder, ensure the "Print speed mode" of labels that are
sent to the print group is set to "External". see
.
3. To ensure good print performance and encoder accuracy, it is
recommended to use a 2 channel quadrature encoder.
Required tools: metric ruler and calculator.
To setup an external shaft encoder to measure the production line movement:
1. If the print group is active, stop the print group. Select
STOP
, select the print group and
select
Stop
.
2. Select
Home > Setup > Production line setup > Line movement
.
3. Select a
Print group
tab, to choose which print group to setup.
4. Select the
Encoder input
setting and select:
External 1
Use the encoder connected to ENC 1
External 2
Note
Gx-IC10/Gx-OEM Only.
Use the encoder connected to ENC 2.
5. Make a note of the
Encoder scale (pulses/m)
value.
6. Select
Home > Label manager
> Open.
7. Locate
ruler.lbl
and select the send to print icon:
8. Select the print group and select
Send
.
INSTALLATION
EPT053091 - Issue 5 - 07 May 2021
74
Summary of Contents for Gx-OEM
Page 1: ...Gx Series Product Manual Gx150i Gx350i Gx OEM ...
Page 63: ...3 Install the faceplate End of procedure INSTALLATION EPT053091 Issue 5 07 May 2021 58 ...
Page 65: ...3 Install the faceplate End of procedure INSTALLATION EPT053091 Issue 5 07 May 2021 60 ...
Page 122: ...The illustration below shows the Setup screen OPERATION 117 EPT053091 Issue 5 07 May 2021 ...
Page 197: ...EPT053091 Issue 5 07 May 2021 192 ...