![background image](http://html1.mh-extra.com/html/daikin/fhq100buv1b-x-2/fhq100buv1b-x-2_service-manual_2459261119.webp)
Field Settings
SiBE28-804
108
Test Operation
2.12 I-Demand Function
Purpose
Set a limitation towards the power consumption from the system.(e.g. budget control, limit
power consumption during peak moments,..)
Setting
3 different demand setting can be selected by using terminal X801M:
Demand 1
→
Close contact between COM and contact 1
Demand 2
→
Close contact between COM and contact 2
Demand 3
→
Close contact between COM and contact 3
Power supply connector
(on outdoor PCB X77A)
Output on X801M =
12VDC, 12mA
Maximum wire length =
100 meter
Transmission connector
(on outdoor PCB X6A)
ON
OFF
DS1
1 2 3 4
X81A
X80A
X800M
X801M
X801M
1
LNOP COM
2
3
1
LNOP
COM
2
3
Summary of Contents for FHQ100BUV1B x 2
Page 13: ...SiBE28 804 2 ...
Page 19: ...Model Name and Power Supply SiBE28 804 8 General Information ...
Page 29: ...Specifications SiBE28 804 18 Specifications ...
Page 33: ...Wired Remote Controller SiBE28 804 22 Remote Controller 1 2 Installation ...
Page 34: ...SiBE28 804 Wired Remote Controller Remote Controller 23 ...
Page 93: ...Outdoor Unit Fan Speed Control SiBE28 804 82 Functional Description ...
Page 131: ...Test Run and Operation Data SiBE28 804 120 Test Operation ...
Page 251: ...Troubleshooting by Remote Controller Display LED Display SiBE28 804 240 Troubleshooting ...
Page 277: ...PCB Layout SiBE28 804 266 Appendix ...
Page 297: ...RZQ100 140C7 RZQS125 140C7V1B SiBE28 804 286 Removal Procedure ...
Page 311: ...SiBE28 804 iv Index ...