ENGINE FUEL 6M-19
O IL G A G E TUBE
SU P PO R T —
PS100-150(35)
A IR C LE A N E R STUD
A S M
UPC 6Y
NOTE
Position red adhesive surface
G A S K E T T ] dow n w hen installing gaskets.
' r t j_ l 11
^ FWD
/ C
a
IR C L E A N E R PS100-150
E X T E N S IO N
PS MODELS
Fig. 4 A — A ir Cleaner and Heat Stove, P Series
moved for regularly scheduled element cleaning. At this
time, immerse the cover (far enough to cover the ther
mostat pellet) in water of less than 80°F. The valve
should remain closed. Gradually raise temperature of
the water. The valve should begin to open at a water
temperature of 83°F and be fully open at a temperature of
120°F.
Thermostat Replacement (Fig. 5A)
1. Remove sheet metal to air cleaner hose from the air
cleaner cover.
Fig. 5 A — Thermostatic A ir V a lv e Pellet Replacement
Fig. 6 A — Thermostatically Controlled A ir Cleaner
10-30 CHEVROLET TRUCK SERVICE MANUAL
Summary of Contents for 10 1971 Series
Page 1: ......
Page 96: ......
Page 100: ...10 30 CHEVROLET TRUCK SERVICE MANUAL Fig 4 10 30 Series Truck Frame FRAME 2 4 ...
Page 120: ......
Page 203: ...ENGINE 6 25 Fig 22L Engine Mounts 10 30 CHEVROLET TRUCK SERVICE MANUAL ...
Page 215: ...ENGINE 6 37 REAR M O U NT Fig 21V Engine Mounts 10 30 CHEVROLET TRUCK SERVICE MANUAL ...
Page 218: ......
Page 249: ......
Page 324: ......
Page 340: ......
Page 365: ...10 30 CHEVROLET TRUCK SERVICE MANUAL Fig 43 Power Steering Pump M ounting STEERING 9 25 ...
Page 368: ......
Page 386: ......
Page 390: ...ELECTRICAL BODY AND CHASSIS 12 4 10 30 CHEVROLET TRUCK SERVICE MANUAL ...
Page 391: ......
Page 428: ......
Page 432: ......
Page 449: ...SPECIFICATIONS 9 10 30 CHEVROLET TRUCK SERVICE MANUAL ...
Page 463: ......
Page 464: ......
Page 465: ......
Page 466: ......