CHAPTER 8 FIXING SYSTEM
8-22
COPYRIGHT © 2002 CANON INC. CANON CLC1100/1130/1150/1160/1180 REV.1 FEB. 2002 PRINTED IN JAPAN (IMPRIME AU JAPON)
2. Mounting the Fixing Upper
Cleaning Belt
The feed shaft, take-up shaft, and belt
(service part) are constructed as a single entity
(service part).
Mount the fixing upper cleaning belt by
reversing the steps used to remove it with the
following in mind:
1) Wind the cleaning belt around the cleaning
belt take-up shaft [1] two to three times.
2) Mount the feed shaft [2] of the cleaning
belt as shown.
3) Put the lever [3] of the fixing upper
cleaning belt length sensor inside.
4) Mount the take-up shaft of the cleaning
belt as shown.
Figure 8-424 (rear view)
[1]
[2]
Figure 8-425
5) Operate the cleaning belt feed lever [4]
10 to 20 times to remove all slack.
The cleaning belt can be-
come slack when you re-
lease the upper roller unit
during servicing work. At
the end of each servicing
job, be sure to operate the
cleaning belt drive assem-
bly 10 to 20 times by hand
to remove the slack.
[3]
(front)
(rear)
Figure 8-426
[4]
Summary of Contents for CLC 1130
Page 8: ......
Page 24: ......
Page 26: ......
Page 33: ......
Page 55: ......
Page 101: ......
Page 103: ......
Page 121: ......
Page 141: ......
Page 143: ......
Page 159: ......
Page 239: ......
Page 247: ......
Page 255: ......
Page 261: ......
Page 263: ......
Page 369: ......
Page 397: ......
Page 399: ......
Page 451: ......
Page 453: ......
Page 493: ......
Page 495: ......
Page 549: ......
Page 556: ......
Page 563: ......
Page 586: ......
Page 670: ......
Page 674: ......
Page 683: ......
Page 698: ......
Page 704: ......
Page 711: ......
Page 785: ......
Page 799: ......
Page 829: ......
Page 945: ......
Page 957: ......
Page 959: ......
Page 963: ......