COPYRIGHT © 2002 CANON INC. CANON CLC1100/1130/1150/1160/1180 REV.2 FEB. 2002 PRINTED IN JAPAN (IMPRIME AU JAPON)
xv
CHAPTER 11 INSTALLATION
I.
SELECTING THE SITE ............ 11-1
II.
INSTALLATION ......................... 11-4
A. Unpacking ........................... 11-4
B. Removing the Fixing Materials
and Mounting the Waste Toner
Collection Case ................... 11-7
C. Supplying Fixing Oil ............ 11-9
D. Mounting the Drum Cleaner
and Setting the Environment
Switch ................................ 11-11
E. Supplying Toner ................ 11-15
F. Supplying the Starter
Developer .......................... 11-19
G. Checking the Images and
Operations ......................... 11-23
H. Changing the Cassette
Paper Size ......................... 11-25
III.
RELOCATING THE COPIER . 11-28
IV.
MOUNTING THE DOCUMENT
HOLDER ................................ 11-30
V.
INSTALLING THE CONTROL
CARD UNIT-V ......................... 11-31
1. Mounting the Control
Card Unit ..................... 11-31
VI. INSTALLING THE COPY DATA
CONTROLLER-A1 ................. 11-33
1. Setting the Board ........ 11-33
2. Installing to the
Copier .......................... 11-
34
3. Checking Operations .. 11-
36
4. Removing from the
Copier .......................... 11-
36
VII. INSTALLING THE REMOTE
DIAGNOSTIC DEVICE II ....... 11-
37
1. Installing to the
Copier .......................... 11-
37
VIII. INSTALLING THE CASSETTE
HEATER ................................. 11-
46
CHAPTER 12 MAINTENANCE AND SERVICING
I.
PERIODICALLY REPLACED
PARTS ..................................... 12-1
II.
CONSUMABLES AND
DURABLES .............................. 12-2
A. Copier .................................. 12-2
B. Paper Deck .......................... 12-4
III.
SCHEDULED SERVICING
CHART ..................................... 12-5
IV.
SCHEDULED SERVICING
LIST .......................................... 12-7
A. Copier .................................. 12-7
B. Paper Deck.......................... 12-8
CHAPTER 13 TROUBLESHOOTING
I.
MAINTENANCE AND
INSPECTION ........................... 13-3
A. Image Adjustment Basic
Procedure............................ 13-3
B. Points to Note for Scheduled
Servicing ............................. 13-6
II.
STANDARDS AND
ADJUSTMENTS ....................... 13-7
A. Image Adjustment
System ..............................
13-7a
B. Exposure System .............. 13-14
C. Image Formation System .. 13-15
D. Pickup/Feeding System .... 13-20
E. Fixing System ................... 13-28
F. Externals/Controls ............ 13-31
G. Paper Deck ........................ 13-32
H. Electrical System .............. 13-36
III.
TROUBLESHOOTING
FAULTY IMAGES ................... 13-51
A. Making Initial Checks ........ 13-51
Summary of Contents for CLC 1130
Page 8: ......
Page 24: ......
Page 26: ......
Page 33: ......
Page 55: ......
Page 101: ......
Page 103: ......
Page 121: ......
Page 141: ......
Page 143: ......
Page 159: ......
Page 239: ......
Page 247: ......
Page 255: ......
Page 261: ......
Page 263: ......
Page 369: ......
Page 397: ......
Page 399: ......
Page 451: ......
Page 453: ......
Page 493: ......
Page 495: ......
Page 549: ......
Page 556: ......
Page 563: ......
Page 586: ......
Page 670: ......
Page 674: ......
Page 683: ......
Page 698: ......
Page 704: ......
Page 711: ......
Page 785: ......
Page 799: ......
Page 829: ......
Page 945: ......
Page 957: ......
Page 959: ......
Page 963: ......