Using your LinkStation
LinkStation User Manual
94
Note:
If power is turned off during a RAID rebuild, the RAID rebuild will continue when power is restored.
[Confirm Operation] screen
When you perform any of the following tasks, a [Confirm Operation]
screen is displayed . To continue, enter the displayed number within 60
seconds and click [Apply].
• Change RAID array (Create/Delete)
• Format Array or Disk
• Delete Folder
• Remove Disk
• Restore Factory Defaults
• Rebuild RAID array
• Format LinkStation