8 - Troubleshooting & Maintenance
109
8.8
SCR Replacement
This section is to help with SCR replacements on stack assemblies. Please read prior to installation.
8.8.1 Typical
Stack
Assembly
8.8.2
SCR Removal
To remove the SCR from the heatsink, loosen the two bolts (3) on the loader bar side of the clamp. Do not turn
on the nuts (5). The nuts have a locking ridge that sink into the aluminum heatsink. Do ¼ turns until the SCR
comes loose. Remove the SCRs from the heatsink.
NOTE:
Do not loosen nut on indicator washer (6). This will change the clamping pressure of the clamp
and the clamp will be defective.
8.8.3
SCR Installation
•
Coat the faces of the SCRs to be installed with a thin layer of EJC (Electrical Joint Compound).
•
Place the SCRs onto the dowel pins. The top SCR will have the cathode to the left and the bottom SCR will
have the cathode to the
right. The SCR symbol has a triangle that points to the cathode.
• Finger tighten nuts on the bolts.
Summary of Contents for RediStart MX2 SEP
Page 2: ......
Page 8: ...RediStart MX 2 SEP Synchronous Controller User Manual 8 ...
Page 14: ...RediStart MX 2 SEP Synchronous Controller User Manual 14 ...
Page 36: ...RediStart MX 2 SEP Synchronous Controller User Manual 36 ...
Page 52: ...RediStart MX 2 SEP Synchronous Controller User Manual 52 ...
Page 98: ...RediStart MX 2 SEP Synchronous Controller User Manual 98 ...
Page 114: ...RediStart MX 2 SEP Synchronous Controller User Manual 114 ...
Page 116: ...RediStart MX 2 SEP Synchronous Controller User Manual 116 ...
Page 118: ...RediStart MX 2 SEP Synchronous Controller User Manual 118 ...
Page 128: ...RediStart MX 2 SEP Synchronous Controller User Manual 128 ...
Page 129: ...Publication History Revision Date ECO 00 12 15 06 Initial Release 01 12 04 15 E4926 ...