Installing IP500/IP500 V2
Page 61
15-601042 Issue 28c (19 August 2013)
IP Office 9.0
Installation Requirements: Environmental Requirements
2.2 Space Requirements
IP Office control units and modules are designed to be installed either in a free-standing stack or into a 19" rack system.
Rack installation requires a
rack mounting kit
for each control unit and expansion module.
·
Cable Clearance
Clearance must be provided at the front and rear of all modules for cable access and feature key dongle connection.
·
On IP500 and IP500 V2 systems allow a minimum clearance of 90mm (3.5 inches).
·
Additional Clearance
Care should be taken to ensure that the positioning of the modules does not interrupt air flow and other factors that
may affect
environmental requirements
. This is especially important on IP500 and IP500 V2 control units which
have ventilation slots at the side.
·
Cable Access
Power cords must not be attached to the building surface or run through walls, ceilings, floors and similar openings.
Installation measures must be taken to prevent physical damage to the power supply cord, including proper routing
of the power supply cord and provision of a socket outlet near the fixed equipment or positioning of the equipment
near a socket outlet.
46
60
Summary of Contents for IP500
Page 1: ...15 601042 Issue 28c 19 August 2013 Installing IP500 IP500 V2 IP Office 9 0 ...
Page 10: ......
Page 12: ......
Page 58: ......
Page 120: ......
Page 132: ...Installing IP500 IP500 V2 Page 132 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...
Page 138: ...Installing IP500 IP500 V2 Page 138 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...
Page 422: ......
Page 434: ......
Page 440: ......
Page 441: ...Installing IP500 IP500 V2 Page 441 15 601042 Issue 28c 19 August 2013 IP Office 9 0 ...