50
Control room
•
Go through the main components and the purpose of it.
•
Go through the user manual.
- Display menu.
- Adjustment.
- Daily / weekly control.
- Operating journal.
- Alarm menu log.
- Trouble shooting.
- Service.
•
Interval.
•
Parts.
Go through the zones
•
Unit position.
•
Sensor position.
•
The impact of changes in air stream, draft and temperature variation.
•
Check that all setpoints and settings are accordingly with the data in order confirmation. Note if customer want the system startet and set at settings that variate
from capacity sheet / order confirmation.
Scada and dataLog presentation
•
Logfile.
•
Mail setup.
Handover checklist
Filter element / house how to change
Oil change
Inlet pressure where to see it
Atomizer location
Salt filling softener
Nozzle change How to.
Water sample / test valve softener
Sensor location
Ro menu
Scada use
Ro test procedure / where and how
Datalog file import and monitoring
Ro trouble shooting
Leave a few spare nozzle if needed
Ro Spareparts
Fill out the first line in journal with customer
Hydrosens menu
Fill our Airtec care with final values.
Hydrosens trouble shooting and log
User manual
Hydrosens Sparepart
Electricial diagram
Oil glass inspection ( check for oil color/level )
Commisioning report Signed
201218