41
6.5
RO Inline™
Before you start:
•
Slowly turn on water supply to avoid pressure boost.
•
Let the hose from water outlet run to drain.
•
Let the coiled 4 mm drain hose run to drain.
•
Open outlet ball valve.
Power on:
•
Turn on fuse F2.
•
System will startup and open water inlet.
•
Let the system run in this setting until all air is out of the membrane, approx. 3 -5 minutes.
•
Read the hole setion before starting the pump.
•
Turn on fuse F1, the pump will start.
Adjust membrane pressure:
•
Adjust membrane pressure to 10 - 12 bar.
•
Make sure during setup that the membrane pressure is max. 13 bar.
Adjust drain hose:
•
Go to the screen with production and drain flow.
•
Adjust the drain flow by shortening the 4 mm drain hose cm by cm until the required drain
flow is reached:
•
min. 30 % with softener
•
min. 50 % without softener
•
The higher the drain flow is, the longer the membrane lifetime
Vessel Pressure
Bar 4.92
Prod. l/h 300
Drain l/h 96
Drain % 32
•
Turn off fuse F1 and F2 .
•
Reconnect the 4 mm drain hose.
•
Close the outlet ball valve.
Normal run:
•
Turn on fuse F1 and F2.
•
Let the system run until it reaches the stop pressure, default 5 bar,
then it will do a hygiene flush.
•
It will empty the pressure vessel down to the starting pressure, default 2 bar.
The pump will start again and fill the pressure vessel.
Check:
•
When the pump runs:
Check pressure gauge, that the membrane pressure is 10-12 bar.
•
When the pump stops:
Check that the production flow and drain flow values are OK.
•
If not, make the adjustment again and go to next step.
Vessel Pressure
Bar 4.92
Prod. l/h 300
Drain l/h 96
Drain % 32
•
Take a water sample from the designated tab.
•
Let the water run for 1 min. before taking the sample .
•
Messure µS/cm.
Set flow limits:
•
Setup the drain flow alarm limit. Recomended 5 % lower than min. required level.
•
Setup the production flow alarm limit
.
Recomended 10 l/h above max. required output.
•
Connect the 3/4” outlet hose to the humidification system.
•
Slowly open the outlet ball valve until it’s fully open.
-Production Set
Min. l/h
200
Delay Sec.
20
-Drain Setup
Min. %
25
Delay Sec.
20