4
This manual has been written to ensure the safe use, performance and longevity of the equipment and is intended for use by proper trained technical personnel.
Airtec® A/S works continuously on research and development. Airtec® A/S reserved the right to amend, without notice, the specifications provided in this document.
Airtec® A/S does not guarantee, or accept liability for the accuracy of the information of this document.
Correct use:
The Airtec® A/S humidification system is intended for adiabatic humidification and cooling. Any other use is not considered intended use.
Warranty:
Airtec® A/S parts are warranted for 2 years from date of invoice, against material and manufacturer defects of the product. Failure to observe the manufacturers
installation and maintenance recommendations and instructions will invalidate the warranty.
Guide to symbols:
Instructions relating to safety
Instructions relating the correct operations of the product
2. Prior To The Installation
Prior to installation there is a range of relevant steps to consider.
The shipment and delivery note:
Carefully check that the supplied equipment is undamaged at arrival. Do not accept delivery of damaged freight. Report to Airtec® A/S.
Check that the content of the shipment matches the delivery note.
Site survey:
Go through the site with relevant customer representative, use the supplied layout drawing, handover document and order confirmation to vertify and agree the steps
of the installation. Minor changes and adjustments to the installation and layout should be agreed at this stage. Look out for air vents, down draft, turbulence, comfort
zones etc. things that can negatively influence the performance of the atomizers and the system, the people on site, products and processes.
Power, water and drain:
Check that all supplies are ready and accordingly with specifications.
Installation and maintenance guide:
Please read Airtec SystemGuide thoroughly before specifying, designing, installing or maintaining an Airtec® A/S system.
Health and safety:
Installation, maintenance, repair work or de-commissioning should only be carried out by proper trained technical personnel. You should make sure to comply with the
customers on site guidelines for health and safety. You should ensure that the installation of the equipment complies with that of local regulations.
Any risks or hazards relating to the system, including during installation and maintenance, should be identified by a competent health and safety representative who shall
be responsible for introducing effective control measures and relevant guidelines. You should make sure to bring any issues forward to the representative.
Always isolate all supplies to the system before commencing any work on the system.
Secure the system power supply against unintented reconnection during work.
Personnel protective equipment:
An appointed health and safety representative shall be responsible that all relevant guidelines and rules are followed.
Hygiene:
To prevent growth of bacteria, users are required to:
•
Carry out risk assessment of the water, implementing an appropriate monitoring and control system
•
Avoid water temperatures which favor growth of bacteria
•
Avoid stagnant water
•
The Airtec® A/S system should at all times be connected to a clean mains water supply.
•
A water report should be conducted by the customer from the connection point.
•
Customer supplied treated water should be checked for additives or chemicals of any kind.
•
The Airtec® A/S system should always be left in operation mode and left powered on at all time.
•
Cleaning and disinfection to be performed in accordance with the technical guidelines in this systemguide.
This humidifier should be installed, operated and maintained in accordance with this manual and system user manual
1. Preface
201218