Example Results
The following figure shows the graphical result of a typical Eye Opening
measurement:
Eye Opening - Procedures
This section shows how to set up and perform an Eye Opening
measurement. As an example we measure the eye diagram of a shielded
cable.
This requires the following steps:
•
Preparing the measurement (see
“How to Prepare the Eye Opening
)
Advanced Analysis
5
Agilent J-BERT N4903 High-Performance Serial BERT
223
Summary of Contents for J-BERT N4903
Page 1: ...S Agilent J BERT N4903 High Performance Serial BERT User Guide s Agilent Technologies...
Page 68: ...2 Setting up Patterns 68 Agilent J BERT N4903 High Performance Serial BERT...
Page 158: ...4 Setting up the Error Detector 158 Agilent J BERT N4903 High Performance Serial BERT...
Page 314: ...6 Evaluating Results 314 Agilent J BERT N4903 High Performance Serial BERT...
Page 374: ...7 Jitter Tolerance Tests 374 Agilent J BERT N4903 High Performance Serial BERT...
Page 394: ...8 Solving Problems 394 Agilent J BERT N4903 High Performance Serial BERT...
Page 434: ...Index 434 Agilent J BERT N4903 High Performance Serial BERT...