protected zone). A fault current calculation gives the largest current of faults, Iscmax,
at the most remote part of the primary protected zone. The risk of transient overreach
must be considered, due to a possible DC component of the short circuit current. The
lowest current setting of the fastest stage can be written according to
max
1.2
t
sc
high
I
k I
³
× ×
EQUATION1265 V1 EN-US
(Equation 31)
where:
1.2
is a safety factor
k
t
is a factor that takes care of the transient overreach due to the DC component of the fault current
and can be considered to be less than 1.05
Iscmax is the largest fault current at a fault at the most remote point of the primary protection zone.
The operate time of the phase overcurrent protection has to be chosen so that the fault
time is short enough that the protected equipment will not be destroyed due to thermal
overload while, at the same time, selectivity is assured. For overcurrent protection in a
radial fed network, the time setting can be chosen in a graphical way. This is mostly
used in the case of inverse time overcurrent protection. Figure
shows how the time-
versus-current curves are plotted in a diagram. The time setting is chosen to get the
shortest fault time with maintained selectivity. Selectivity is assured if the time
difference between the curves is larger than a critical time difference.
Section 8
1MRK 511 401-UUS A
Current protection
162
Bay control REC670 2.2 ANSI
Application manual
Summary of Contents for Relion REC670
Page 1: ...RELION 670 SERIES Bay control REC670 Version 2 2 ANSI Application manual ...
Page 2: ......
Page 26: ...20 ...
Page 42: ...36 ...
Page 96: ...90 ...
Page 274: ...268 ...
Page 292: ...286 ...
Page 298: ...292 ...
Page 308: ...302 ...
Page 470: ...464 ...
Page 514: ...508 ...
Page 608: ...602 ...
Page 646: ...640 ...
Page 656: ...650 ...
Page 657: ...651 ...