4 - 68
ENG
CRANKCASE, CRANKSHAFT AND BALANCER
Extent of removal
Order
Part name
Q’ty
Remarks
1
Intake timing chain guide
1
2
Timing chain
1
3
Bolt [45 mm (1.8 in)]
7
4
Bolt [55 mm (2.2 in)]
1
5
Bolt [30 mm (1.2 in)]
2
6
Lead guide
1
7
Clutch cable holder
1
8
Right crankcase
1
Use special tool.
Refer to “REMOVAL POINTS”.
9
Left crankcase
1
10
Balancer
1
11
Crankshaft
1
Use special tool.
Refer to “REMOVAL POINTS”.
12
Bearing
3
Refer to “REMOVAL POINTS”.
3
2
1
Содержание TT-R125E(R)
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 147: ...SPEC MEMO...
Страница 169: ...INSP ADJ MEMO...
Страница 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Страница 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Страница 290: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 541: ...ELEC MEMO...
Страница 553: ...ELEC MEMO...
Страница 573: ...ELEC MEMO...
Страница 576: ......
Страница 577: ......
Страница 578: ...PRINTED IN JAPAN 2002 11 0 7 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...