3 - 36
INSP
ADJ
●
Before removing the battery charger lead
clips from the battery terminals, be sure
to turn off the battery charger.
●
Make sure the battery charger lead clips
are in full contact with the battery termi-
nal and that they are not shorted. A cor-
roded battery charger lead clip may
generate heat in the contact area and a
weak clip spring may cause sparks.
●
If the battery becomes hot to the touch at
any time during the charging process,
disconnect the battery charger and let the
battery cool before reconnecting it. Hot
batteries can explode!
●
As shown in the following illustration, the
open-circuit voltage of an MF battery sta-
bilizes about 30 minutes after charging
has been completed. Therefore, wait 30
minutes after charging is completed
before measuring the open-circuit volt-
age.
BATTERY INSPECTION AND CHARGING
Содержание TT-R125E(R)
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 147: ...SPEC MEMO...
Страница 169: ...INSP ADJ MEMO...
Страница 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Страница 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Страница 290: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 541: ...ELEC MEMO...
Страница 553: ...ELEC MEMO...
Страница 573: ...ELEC MEMO...
Страница 576: ......
Страница 577: ......
Страница 578: ...PRINTED IN JAPAN 2002 11 0 7 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...