– Check wiring between test box and connector for open cir-
cuit referring to current flow diagram.
◆
Contact 1 + socket 89
◆
Contact 2 + socket 9
● Cable resistance: max. 2.0 Ω.
– Also check wiring for short to one another, short to battery
earth/engine earth and short to battery positive. Specifica-
tion: ∞ Ω
If no fault in lines is detected:
– Renew engine control unit -J623-
.
Industriemotoren - Industrial Engines 2009
▶
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
3
3 Checking components and functions
349