1 - 15 Nm
2 - Sealing flange
q
With seal.
q
Must sit on dowel
sleeves
q
Removing and in-
stalling.
q
Insert with silicone
sealant
D 176 404 A2.
q
Do not additionally
oil or grease the oil
seal sealing lip.
q
Before installing, re-
move oil residue
from crankshaft
journal using a
clean cloth.
3 - Toothed belt for oil
pump
q
Check for damage
and wear
q
Renew as needed
Note
◆
Belts which have
been in use longer
can sag.
◆
This is not a fault
and does not neces-
sarily mean belt
needs replacing.
4 - 10 Nm
5 - Oil dipstick
q
The oil level must not be above the max. mark!
q
Markings
6 - Guide tube
q
Renew O-ring.
7 - Clip
8 - Dowel sleeves
q
Renew
9 - O-ring
q
Renew
10 - 10 Nm
11 - Oil pump with pressed-on toothed belt pulley
q
With 12 bar pressure relief valve
q
Before installing, check that both dowel sleeves for centring oil pump on cylinder block are fitted.
If toothed belt or oil pump have to be removed:
Industriemotoren - Industrial Engines 2009
▶
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
3
2 Parts of lubrication system
255