– Observe rules for cleanliness
– Drain coolant
– Pull coolant hoses off radiator.
– Pull off all coolant hoses to engine using assembly tool for
spring-type clips -VAS 5024-.
– Disconnect all electrical wiring from gearbox, alternator and
starter and lay to side.
– Pull off or disconnect all other electrical connections as nec-
essary from engine and lay to side.
– Pull off necessary vacuum and breather hoses from engine.
– Release clamp for front exhaust pipe/diesel particulate filter.
Power units with air conditioning system:
– Observe additional information and installation work
.
1.2
Securing engine to assembly stand
Before carrying out repair work, secure engine on engine and
gearbox support -VAS 6095/1- using universal mounting
-VAS 6095-.
Procedure
– Attach lifting tackle -3033- as shown and raise engine using
workshop hoist -V.A.G 1202 A- or workshop hoist
-VAS 6100-.
Flywheel end:
● Position 4.
Vibration damper end:
● Position 8.
– Engine can now be moved using lifting tackle.
– Secure engine on engine and gearbox support -VAS 6095/1-
using universal mounting -VAS 6095-.
1.3
Notes on installing
Installation is carried out in the reverse order. When installing,
note the following:
Procedure
Note
The clutch and related components are not always in the scope
of supply from Volkswagen. Adhere to the manufacturing speci-
fications when performing any maintenance and repair work.
– Check whether dowel sleeves for centring engine/gearbox
have been fitted in cylinder block, insert if necessary.
– Screw in all bolts on assembly mountings by hand approx.
5…6 turns.
3
Industriemotoren - Industrial Engines 2009
▶
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
136
Repair Group 10 - Removing and installing engine