– Pull coolant hoses off connections -A, B and D-.
– Pull coolant pipe out of connection -C-.
– Remove securing bolts -3- for 4/2-way valve -2-.
– Pull valve out of cylinder block and then to the left to subse-
quently separate connection -C- from coolant pipe.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
Note
Clean sealing surfaces. Renew gaskets and seals.
– First seat 2-way valve with connection -C- on coolant pipe
then insert into cylinder block.
– Insert securing bolts -3-, and tighten them to 15 Nm.
– Connect coolant hoses as follows:
◆
-A-: Bypass line to cylinder head
◆
-B-: Expansion tank
◆
-D-: Radiator return line
.
– Install throttle valve module -J338-
.
Industriemotoren - Industrial Engines 2009
▶
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
3
1 Removing and installing parts of cooling system
291