Installing:
– Slide oil seal -A- by pressing on outside over sleeve -
T10122/1- onto pulling sleeve - T10122/2- .
– Separate assembly sleeves.
– Locate pulling sleeve - T10122/2- with dry oil seal on crank‐
shaft journal.
– Tap sealing ring into the timing chain cover as far as it will go,
using the thrust piece - T10122/3- .
Further assembly is basically a reverse of the dismantling se‐
quence.
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
2. Cylinder block, gearbox end
39