2
Cover for timing chain
page 78
⇒ “2.4 Assembly overview - valve timing housing”, page 79
2.1
Assembly overview - cover for timing
chain
⇒ “4.5 Removing and installing camshaft control valve”,
1 - Sealing ring
❑ For crankshaft
❑ Renewing
2 - Lower cover for timing chain
❑ Gearbox side
❑ Removing and installing
3 - Bolt
❑ 23 Nm
4 - Bolt
❑ Tighten in stages and in
diagonal sequence.
❑ 8 Nm
5 - Sealing ring
❑ Qty. 2
❑ For camshaft control
valve 1 - N205- and ex‐
haust camshaft control
valve 1 - N318-
❑ Renew if leaking or
damaged.
❑ Renewing
6 - Bolt
❑ 8 Nm
7 - Hall sender
❑ Hall sender - G40- and
Hall sender 2 - G163-
8 - O-ring
❑ Qty. 2
❑ Renew
9 - Dowel pins
❑ Qty. 2
10 - Upper cover for timing chain
11 - Cylinder head gasket
❑ Clean drillings and fill with sealant
.
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
2. Cover for timing chain
75