– Push locking devices of connectors in -direction of arrow- and
pull off connectors.
Installing:
– Fit connectors to engine control unit and slide locking devices
onto stop in -direction of arrow-.
– Fit retaining bar -1- onto connectors and press it in direction
of -arrow-.
– Push guide pin -2- to stop into hole on valve timing housing.
– Bolt retaining bar with new shear-head bolts onto the engine
control unit -arrows- until the bolt heads shear off.
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
192
Rep. gr.24 - Mixture preparation - injection