Operations
101
© 2006 Vision Engraving Systems
To drain the reservoir this indicator level can be swiveled downwards and the water will
drain.
Regulating the water flow
A minimal amount of water is needed during the engraving process. The flow can be
regulated by adjusting the valve located directly behind the vise. Clockwise reduces the flow
and counterclockwise increases the flow.
The pump is turned on automatically from the software when sending a job. Even though it
is simple enough to adjust the flow during the engraving process, the pump can be turned
on manually to check the flow. Press “Menu” and scroll until “Pump” is reached. Press
“Shift” and then “Enter” and the pump will turn on and adjust the flow to a trickle. Press
“Shift” and “Enter” again to shut it off.
Setting the surface
Press the “Jog Mode” key, this will allow the Z axis to be moved up or down, the green LED
will now be lit on the key. Using the down arrow key move the Z axis down until the diamond
Содержание MaxPro
Страница 5: ...Chapter I ...
Страница 11: ...Chapter II ...
Страница 23: ...Configuration 19 2006 Vision Engraving Systems 3 Click on the IP Address tab ...
Страница 60: ......
Страница 61: ...Chapter III ...
Страница 100: ...Vision MaxPro 96 2006 Vision Engraving Systems Mounting the item to be engraved ...
Страница 114: ...Vision MaxPro 110 2006 Vision Engraving Systems Select Finish The Plate Size screen will appear ...
Страница 137: ...Operations 133 2006 Vision Engraving Systems If No is clicked the program returns to the Flat plate dimension screen ...
Страница 179: ...Operations 175 2006 Vision Engraving Systems The Plot screen below will appear ...
Страница 182: ......
Страница 183: ...Chapter IV ...
Страница 191: ...Chapter V ...
Страница 202: ...Vision MaxPro 198 2006 Vision Engraving Systems W Windows 2000 15 Windows 98 18 Windows XP 12 ...
Страница 203: ......