5.
If prompted, insert a new GX5
™
Chip and Genexus
™
Coupler. Insert the chip into
the chip install slot with the chip notch oriented down and toward the front of
the instrument.
1
1
Notched corner of chip
Note:
A chip shuttle under the deck moves the installed chip to loading and
sequencing positions during the run.
6.
When the deck consumables have been loaded, lock the library and templating
strips in place by sliding the latches toward the rear of the deck.
If a chip is detected and the strip latches are closed, the Close Deck Door screen
appears.
Chapter 7
Load the sequencer and start a run
Load the sequencer and start a run
7
78
Genexus
™
Integrated Sequencer User Guide