4.
In the Load Deck screen, the sequencer instructs you step by step to load each
required consumable in a highlighted position on the deck. The sequencer
detects the loading of each consumable in real-time and advances to the next
component automatically.
IMPORTANT!
Ensure that you remove the primer pool tube cap or caps before
installing the tube carrier on the deck.
Note:
A primer pool tube carrier can only be installed with the position 1 tube in
the back row of the Primer Pool Tube Station. Follow the guidance in the run
setup guide for loading the primer pool tube carrier or carriers in the correct
position and order in the station.
1
2
1
Position 1
2
Position 2
Chapter 7
Load the sequencer and start a run
Load the sequencer and start a run
7
Genexus
™
Integrated Sequencer User Guide
77