September
2017
Sentinel V SC and RT Operation Manual
Page 72
EAR-Controlled Technology Subject to Restrictions Contained on the Cover Page.
Using the Deployment Checklist Panel
The Deployment checklist panel starts or stops the deployment. Click on the
Step 6: Deployment checklist
panel to open the Deployment checklist panel as shown below.
Figure 22.
Deployment Panel
Select Now or Later:
•
Now
– The Sentinel V ADCP will start pinging as soon as the Deploy button is clicked.
•
Later
– Selecting the Later button and entering a date and time in this field enables a delay from
the start of a deployment to the first water profiling ping. The Sentinel V ADCP will sleep from
the time the
Deploy
button is clicked until the set time arrives.
Deployment checklist:
•
Built-in Tests
before deploying the system.
•
Compass
•
Pressure sensor
pressure sensor should be zeroed
•
Battery
– The
•
Silicone oil
•
System clock
– The
clock should be set
before deploying the system.