
Useful Function
------------------------------------------------------------------------------------
52
Detail for Sequential Operation Function
1. The sequential operation time is the sum of each operation time such as hrs., min. and sec.
of Function Setting Item from 102 to 113.
e.g. The operation time for Memory A will be 1 hrs., 10 min. ned 23.4 sec. under the followings.
FUNCTION Setting Item 102 : 1 hrs.
FUNCTION Setting Item 103 : 10 min.
FUNCTION Setting Item 104 : 23.4 sec.
2. The sequential operation will not be executed with the setting of 0 hrs. , 0 min. , and 0.0 sec.
e.g. 1) There is no OUTPUT with the Memory B, if the operation time for the Memory B
is set as "0 hrs., 0 min. , 0.0 sec".
(V)/(A)
(t)
tOff
tC
tA
Sequential Operation Start
Memory
A
Memory
C
tA:Operating Time with Memory A
tC:Operating Time with Memory C
tOff:Operating Time for OUTPUT OFF
e.g. 2) There is no sequential operation and OUTPUT, if the operation time for the
Memory A, Memory B, Memory C and OUTPUT OFF are set as "0 hrs., 0 min. , 0.0 sec".
Содержание ZX-S-H Series
Страница 1: ...Constant Voltage Constant Current DC Power Supply series Instruction Manual ...
Страница 37: ...Basic Operations 33 This is blank page ...
Страница 59: ...Useful Function 55 This is blank page ...
Страница 115: ...Using via Digital Data Communication 111 This is blank page ...
Страница 141: ...Controlling with External Analog Contact Signals 137 This is blank page ...
Страница 147: ...Special Loads 143 This is blank page 守 ...
Страница 188: ... 184 付録 External Diagrams ZX S 400H 400HA 4 M3 ...
Страница 189: ...Appendix 185 ZX S 800H 800HA ...
Страница 190: ...Appendix 186 ZX S 1600H 1600HA ...