12713020-002-2 Revision D – April 2004
SSU-2000 User’s Guide 103
Chapter 4 Commissioning
The commissioning tests for the SSU-2000 are checklist-based operational tests
that field engineers perform at the installation site after completion of installation,
system turn-up, and provisioning to verify that the system is correctly installed,
configured and operating properly. At this point, the system is ready to be placed in
service.
Record the results on the data sheet provided in
In This Chapter
Содержание SDU-2000
Страница 12: ...12 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 18: ...18 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 142: ...Clock Module Reference Data Communications Module 142 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 172: ...Input Module Reference Data Input Adapter Panels 172 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 222: ...Output Module Reference Data Output Adapter Panels 222 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 390: ...SNMP Protocol 390 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 420: ...I O Connector Grounding 420 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Страница 434: ...User Changes to Factory Defaults 434 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...