3-28
ENGINE
• Remove the kick starter driven gear
1
, kick starter shaft spring
2
, and kick starter shaft
3
.
• Remove the cover
4
.
• Remove the element
5
.
REASSEMBLY
• Apply SUZUKI SUPER GREASE “A” onto the inside of the kick
starter shaft spacer.
$
99000-25010: SUZUKI SUPER GREASE “A”
• Apply a light coat of SUZUKI SUPER GREASE “A” onto the
end of the kick starter shaft.
$
99000-25010: SUZUKI SUPER GREASE “A”
• Install the kick starter spring
1
and hook its end onto the clutch
cover hole.
• Install the new circlip to the kick starter shaft.
Содержание UG110 2021
Страница 1: ...UG110 9 9 5 0 0 1 1 1 8 0 0 1 E...
Страница 27: ...2 14 PERIODIC MAINTENANCE...
Страница 147: ...6 6 ELECTRICAL SYSTEM 6 7 6 7 6 8 6 8 TROUBLESHOOTING...
Страница 183: ...SERVICING INFORMATION 7 11 Cable guide Speedometer cable Cable guide Speedometer cable Cable guide Speedometer gear box...
Страница 197: ...Prepared by Motorcycle Service Department November 1999 Part No 99500 11180 01E Printed in Japan 200...
Страница 198: ...Printed in Japan Y TK...