5-34
CHASSIS
STEERING STEM
CONSTRUCTION
REMOVAL AND DISASSEMBLY
• Remove the handlebar covers. (
7
5-32)
• Remove the front leg shield. (
7
5-5)
• Remove the leg shield cover/rear leg shield. (
7
5-9)
• Remove the master cylinder assembly. (
7
5-20)
• Remove the front fork. (
7
5-24)
• Remove the cable clamp
1
.
ITEM
N.m
kgf.m
A
50
5.0
B
25
2.5
C
30
3.0
"
• Remove the rear view mirror
2
.
• Remove the handlebar left switch.
1
Handlebars
2
Washer
3
Steering stem nut
4
Inner upper race
5
Inner lower race
6
Steel ball (upper) ........ 25 pcs
7
Steel ball (lower) ........ 30 pcs
8
Steering stem
9
Outer lower race
A
Handlebar clamp nut
B
Handlebar set bolt
C
Steering stem locknut
Содержание UG110 2021
Страница 1: ...UG110 9 9 5 0 0 1 1 1 8 0 0 1 E...
Страница 27: ...2 14 PERIODIC MAINTENANCE...
Страница 147: ...6 6 ELECTRICAL SYSTEM 6 7 6 7 6 8 6 8 TROUBLESHOOTING...
Страница 183: ...SERVICING INFORMATION 7 11 Cable guide Speedometer cable Cable guide Speedometer cable Cable guide Speedometer gear box...
Страница 197: ...Prepared by Motorcycle Service Department November 1999 Part No 99500 11180 01E Printed in Japan 200...
Страница 198: ...Printed in Japan Y TK...