ENGINE
3-3
ENGINE REMOVAL AND INSTALLATION
ENGINE REMOVAL
Before taking the engine out of the frame, wash the engine with a
steam cleaner.
• Remove the front leg shield cover. (
7
5-4)
• Remove the battery rubber band
1
.
• Disconnect the
-
battery lead wire
2
.
• Remove the trunk along with the seat. (
7
5-6)
• Remove the frame covers. (
7
5-7)
• Disconnect the starter motor lead wire coupler
3
, engine ground
wire coupler
4
, thermoelement lead wire coupler
5
and igni-
tion coil lead wire coupler
6
.
• Disconnect the generator lead wire coupler
7
and pickup coil
lead wire coupler
8
.
• Disconnect the oil hose
9
from the oil pump.
Содержание UG110 2021
Страница 1: ...UG110 9 9 5 0 0 1 1 1 8 0 0 1 E...
Страница 27: ...2 14 PERIODIC MAINTENANCE...
Страница 147: ...6 6 ELECTRICAL SYSTEM 6 7 6 7 6 8 6 8 TROUBLESHOOTING...
Страница 183: ...SERVICING INFORMATION 7 11 Cable guide Speedometer cable Cable guide Speedometer cable Cable guide Speedometer gear box...
Страница 197: ...Prepared by Motorcycle Service Department November 1999 Part No 99500 11180 01E Printed in Japan 200...
Страница 198: ...Printed in Japan Y TK...