PERIODIC MAINTENANCE 2-13
CHASSIS BOLTS AND NUTS
Tighten initially at 1 000 km (1 month) and every 6 000 km (6 months) thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-14 for the
locations of the following nuts and bolts on the motorcycle.)
ITEM
N.m
kgf.m
1
Front axle nut
42
4.2
2
Handlebar clamp nut
50
5.0
3
Handlebar set bolt
25
2.5
4
Steering stem locknut
30
3.0
5
Front fork clamp bolt
23
2.3
6
Front brake master cylinder mounting bolt
10
1.0
7
Front brake hose union bolt
23
2.3
8
Front brake caliper mounting bolt
26
2.6
9
Front brake disc bolt
23
2.3
0
Front brake caliper air bleeder valve
7.5
0.75
A
Rear axle nut
75
7.5
B
Rear brake cam lever nut
10
1.0
C
Front footrest bolt
23
2.3
D
Rear shock absorber mounting bolt (upper and lower)
32
3.2
Содержание UG110 2021
Страница 1: ...UG110 9 9 5 0 0 1 1 1 8 0 0 1 E...
Страница 27: ...2 14 PERIODIC MAINTENANCE...
Страница 147: ...6 6 ELECTRICAL SYSTEM 6 7 6 7 6 8 6 8 TROUBLESHOOTING...
Страница 183: ...SERVICING INFORMATION 7 11 Cable guide Speedometer cable Cable guide Speedometer cable Cable guide Speedometer gear box...
Страница 197: ...Prepared by Motorcycle Service Department November 1999 Part No 99500 11180 01E Printed in Japan 200...
Страница 198: ...Printed in Japan Y TK...