2-7
2
Ba
sic O
pe
ra
tio
n
Roll media installation procedure
1
Open the Front cover and slide the media
edge guards to each ends of the platen.
Then, close the Front cover.
Note
-
Move the media edge guards to both ends so they cannot enter under the media.
-
After completing the media replacement work, set the media guards. (
P.2-25
[How to use the media edge guard])
- Shift the blower unit to prevent any interference with the operation.
2
Install the flange spacer to the flange at the
right hand side.
3
While holding the flange spacer in place,
insert the flange in the media.
Push the flange in as far as it goes.
Note
-
When inserting the flange in the roll media, be
careful not to cause the media to shift on the roll
or damage the end surface of roll media.
Roll media
Media replacement
This section describes
[Roll media installation / removal procedure]
.
There two situations requiring roll media replacement:
- When the roll media is finished, the roll media is replaced.
- When the roll media is jammed, the roll media is replaced.
The roll media replacement procedure for each case is shown below.
Flange spacer
Flange
IP-5610取説_E.indb 7
09.4.3 3:13:45 PM