Installation
Page 4-22
External Permeation Oven Connections
If the External Permeation Oven is installed, it is connected
via a cable attached to J11. J11 is located on the option
module's rear panel (see Figure 4-1), which may also support
other connectors related to the Photometer or Instrument
Solenoid options.
Table 4-13 External Permeation Oven Connections
2010D
J11
SIGNAL SIGNATURE
_______
_________________
J10-1
J10-2
J10-3
J10-4
J10-5
J10-6
J10-7
J10-8
J10-9
J10-10
J10-11
J10-12
J10-13
J10-14
J10-15
J10-16
J10-17
J10-18
J10-19
J10-20
J10-21
J10-22
J10-23
J10-24
J10-25
Содержание 2010D
Страница 1: ...MODEL 2010D GAS DILUTION CALIBRATOR OPERATIONS MANUAL I N S T R U M E N T S...
Страница 3: ......
Страница 20: ...System Operations Page 3 2 Figure 3 1 The Model 2010D Front Panel...
Страница 42: ...Installation Page 4 15 Figure 4 1 Rear Panel...
Страница 63: ...Operation Page 5 7 Figure 5 5 The Dilution Status Screen Figure 5 6 The Ozone Status Screen...
Страница 177: ...MODEL 2010D GAS DILUTION CALIBRATOR SCHEMATICS...
Страница 178: ......
Страница 182: ...INSTRUMENTS 2548 Shell Road Units A D Georgetown Texas 78628 Phone 512 869 0544Fax 512 869 0993 sales sabio com...