Introduction
Page 1-7
_________________________________________________________________
Miscellaneous:
Temperature 5 - 40 oC
Automatic restart on power up
Warm-Up time less than 30 minutes
Diagnostic routines for system calibration, checkout and leak
testing
Accessories and Options:
Internal UV Ozone Photometer
External Model 1001 or Model 1001P Compressed Air Source
External Model 2500 Permeation Unit
Rack mount kit for 19" (48.3 cm) equipment racks
High-impact plastic transport case
Flow calibration standard
Specifications subject to change without notice
Содержание 2010D
Страница 1: ...MODEL 2010D GAS DILUTION CALIBRATOR OPERATIONS MANUAL I N S T R U M E N T S...
Страница 3: ......
Страница 20: ...System Operations Page 3 2 Figure 3 1 The Model 2010D Front Panel...
Страница 42: ...Installation Page 4 15 Figure 4 1 Rear Panel...
Страница 63: ...Operation Page 5 7 Figure 5 5 The Dilution Status Screen Figure 5 6 The Ozone Status Screen...
Страница 177: ...MODEL 2010D GAS DILUTION CALIBRATOR SCHEMATICS...
Страница 178: ......
Страница 182: ...INSTRUMENTS 2548 Shell Road Units A D Georgetown Texas 78628 Phone 512 869 0544Fax 512 869 0993 sales sabio com...