(
)
3-4. Programming Over Voltage Protection(OVP)
21
3-5. Programming Over Current Protection(OCP)
23
3-6. Programming Under Voltage Limit(UVL)
25
3-7. Programming Over Voltage Limit(OVL)
26
3-8. Programming Under Current Limit(UCL)
27
3-9. Programming Over Current Limit(OCL)
28
29
-------------------
-------------------
-------------------
-------------------
-------------------
-------------------
3 10 KEY LOCK
29
30
GPIB Set-Up
GPIB Installation Set-Up
RS232C Set-Up
RS232C Installation Set-Up
3-12. V/I & LMT DISPLAY
34
---------------------------------------------
----------------------------------------------------
----------------------------------------------------
3-10. KEY LOCK
3-11. IO/Local
LMT DISPLAY Function
V/I Function
3-13. Output ON/OFF
35
3-14. Error Message Display
35
ERROR Check
---------------------------------
-----------------------------------------------
4. CALIBRATION
36
4-1. Characteristics
36
4-2. Preparing Accurate Calibration
36
4-3. Performance of Measuring Instrument for Accurate Calibration
--- 37
4-4. Measuring Technique
37
Equipment Connection
--------------------------------------------------
-----------------------------
----------------------------------
----------------------------------------------------
Electronic Load
Current-Monitoring Resistor(shunt)
DVM(Digital Volt Meter)
Programming
Measuring Position
4-5. Calibration Using Front Panel
39
CALIBRATION KEY Structure
----------------------------
CALIBRATION KEY Structure
Voltage CALIBRATION Operation
Current CALIBRATION Operation
4-6. Calibration Using REMOTE INTERFACE
43
Connecting Measuring Instrument
Remote Calibration Command Sequence
Voltage CALIBRATION Operation
Current CALIBRATION Operation
-------------------
- 3 -