NSC Sicherheitstechnik GmbH
58/69
14.08.2013
Lange Wand 3
B01050 B01060 Operating Installation Manual Solution F1 20130814.doc
33719 Bielefeld
Version S040A13.08
5. Commissioning certificate FCP "Solution F1"
____________________________________________
____________________________________________
Serial number
Date of delivery
F1-6 :
□
F1-18 :
□
___________________________________________
Panel type (please mark) Commission/ Sight
____________________________________________
Installed by : date, technician
General
The commissioning according the national rules requires the complete and accurate installation of
all components of fire control system, as it is specified in the engineering documents.
Checking the documentation
Document
available
yes/no
Repository
Engineering order
Final planning documents
Updated planning documents
Fire brigade documents
Checking the system components
You have to compare the quantity of planned components with the quantity of actually installed
components.
Component
Planned quantity
Installed quantity
Fire control panel
Modules for addressable detectors
Modules for conventional detectors
Automatic detectors
Manual call points
Input-/output modules
Sounder modules
Remote panel
Fire brigade panel
Fire brigade remote panel
Transmission device
Fire brigade key deposit box
Key deposit box release device
Additional power supply
Sounder
Flashlight
Telephone server
SCU800