5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
96
4349322/01 EN
VACUTAP
®
VV
®
10. Position the wire for the terminal box cover and affix using the slotted
head screw.
Figure 93: Terminal box cover
11. Attach the terminal box cover and secure with screws.
Figure 94: Terminal box cover
5.4.4 Installing and connecting the pressure monitoring device
5.4.4.1 Checking the function of the pressure monitoring device
Check the function of the pressure monitoring device before you install it on
the pipe bend or the on-load tap-changer head.
1. Remove the cover cap.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......