6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
156
4349322/01 EN
VACUTAP
®
VV
®
6.1.1.2 Bleeding suction pipe on pipe connection S
1. Remove screw cap from pipe connection S.
Figure 163: Pipe connection S
2. Open vent screw and bleed piping.
3. Close vent screw.
4. Seal vent screw with screw cap.
6.1.2 Grounding the on-load tap-changer
1. Connect grounding screw on the on-load tap-changer head to transformer
cover. It is essential that CUPAL washers be placed directly on the con-
necting lug on both sides. The aluminum side of the CUPAL washers
must be facing the connecting lug.
Figure 164: Grounding screw on on-load tap-changer head
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......