dftr.
chkd
Th
e
re
pr
od
uc
tio
n,
di
st
rib
ut
io
n
an
d
ut
ili
za
tio
n
of
t
hi
s
do
cu
me
nt
a
s
we
ll
as
t
he
c
om
mu
ni
ca
tio
n
of
it
s
co
nt
en
ts
t
o
ot
he
rs
w
ith
ou
t
ex
pl
ic
id
a
ut
ho
riz
at
io
n
is
pr
oh
ib
ite
d.
Of
fe
nd
er
s
wi
ll
be
h
el
d
lia
bl
e
fo
r
th
e
pa
ym
en
t
of
d
am
ag
es
. A
ll
rig
ht
s
re
se
rv
ed
in
t
he
e
ve
nt
o
f
th
e
gr
an
t
of
a
p
at
en
t,
ut
ili
ty
m
od
el
o
r
de
sig
n.
DIN A1
SP
L
27
.08
.07
10
12
52
3
Ch
. I
n
Ch
an
go
N
o.
D
at
e
Na
me
0E
7334690E
On-Load Tap-Changer VACUTAP® V V
'
SPL 27.08.07
Design with tap change supervisory control
Note:
Take care when when installing the electrical lines so that they do not obstruct the OLTC cover when it is opened for maintenance.
Terminal block
M20 x 1,5
Clamping area
ø7 - ø13 mm
Position indicator with
triangle for adjustment position
43
°
13
5
8°
14
1
11
9
10
9
20
52
30
66
,5
44
O
47
,5
36,5
R 7
5
R
9
8 x M6
183
14
8
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......