5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
86
4349322/01 EN
VACUTAP
®
VV
®
5.4.3.1 Checking function of protective relay
Check the function of the protective relay before installing it in piping be-
tween on-load tap-changer head and oil conservator. The associated contact
positions for checking electrical continuity are shown in the dimensional
drawing provided.
1. Loosen the three screws on the terminal box cover and lift off the terminal
box cover.
Figure 75: Terminal box cover
2. Remove the slotted head screw for potential tie-in and remove the termi-
nal box cover with wire.
Figure 76: Terminal box cover
NOTICE
Damage to protective relay!
Damage to protective relay resulting from improper operation.
► Never press both test buttons at the same time.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......