6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
163
4349322/01 EN
VACUTAP
®
VV
®
2. Establish a connecting lead between pipe connection E2 and one of the
pipe connections R, S or Q to ensure equal pressure in the oil compart-
ment and transformer during evacuation.
Figure 168: Connecting lead
3. Fill on-load tap-changer with new insulating fluid using one of the two free
pipe connections of the on-load tap-changer head.
Figure 169: Pipe connections S and R
4. Take an insulating fluid sample from the oil compartment.
5. Record the temperature of the sample immediately after the sample is
taken.
6. Determine dielectric strength and water content at a sample temperature
of 20 °C ± 5 °C. The dielectric strength and water content must comply
with the limit values specified in the technical data [
6.3.2 Bleeding on-load tap-changer head and suction pipe
6.3.2.1 Bleeding on-load tap-changer head
1. Open all forward and return valves in the pipe system.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......