5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
114
4349322/01 EN
VACUTAP
®
VV
®
2. Loosen screws and turn pressure ring segments to one side.
Figure 111: Pressure ring segments
3.
NOTICE!
Align gear unit such that the horizontal drive shaft is flush with
the drive shaft of the gear unit. While aligning the gear unit, turn the unit's
drive shaft such that its output shaft retains its original position. Failure to
do so may result in damage to the de-energized tap-changer and trans-
former when starting up.
Figure 112: Aligning gear unit
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......