6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
162
4349322/01 EN
VACUTAP
®
VV
®
5. Open air-vent valve again and drain off around 5–10 liters of oil via the
drain pipe until the area under the on-load tap-changer head cover is free
of oil.
6. Loosen 24 screws M10/wrench size 17 with locking washers on on-load
tap-changer head cover.
7. Remove the on-load tap-changer head cover.
8. Carefully slide oil-resistant plastic pipe (outer diameter maximum 30 mm,
minimum length = height of on-load tap-c 50 mm) past gearbox
plate between diverter switch and oil compartment to base of on-load tap-
changer, see appendix.
9. Extract oil.
10. Open stop-cock between oil conservator and oil compartment.
ð
The oil from the oil conservator flows into the oil compartment.
11. Extract oil.
12. Place the on-load tap-changer head cover on the on-load tap-changer
head.
13. Use 24 screws M10/wrench 17 to screw down on-load tap-changer head
cover (tightening torque 34 Nm).
6.3 Commissioning transformer at operating site
Before energizing the transformer, check that the motor-drive unit and pro-
tective devices are functioning correctly and fill the on-load tap-changer oil
compartment with fresh insulating fluid.
6.3.1 Filling the oil compartment of the on-load tap-changer with
insulating fluid
NOTICE
Damage to the on-load tap-changer!
Unsuitable insulating fluids cause damage to the on-load tap-changer.
► Use insulating fluids that meet the requirements in accordance with IEC
60296.
► If approved by the transformer manufacturer, you can use synthetic es-
ters in accordance with IEC 61099 or natural esters in accordance with
IEC 62770 approved by Maschinenfabrik Reinhausen GmbH.
1.
NOTICE!
Check whether the on-load tap-changer head cover has a
flange for attaching a pressure relief device. If it does, operation without a
pressure relief device is not permitted and may result in damage to the
on-load tap-changer.
ð
Fit a pressure relief device which is approved for this on-load tap-
changer on the on-load tap-changer head.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......