5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
59
4349322/01 EN
VACUTAP
®
VV
®
2.
NOTICE!
An incomplete tap-change operation may damage the on-load
tap-changer. After operating the diverter switch, continue to crank the
drive shaft of the upper gear unit for 2.5 revolutions in the same direction
in order to correctly complete the tap-change operation.
3. Perform the transformer ratio test.
4. Repeat the transformer ratio test in all operating positions.
5. Switch the on-load tap-changer into adjustment position (see the accom-
panying connection diagram for the on-load tap-changer).
5.3 Installing on-load tap-changer in transformer (bell-type
tank version)
5.3.1 Inserting on-load tap-changer into supporting structure
1. Remove red-colored packaging material and transport material from on-
load tap-changer.
2.
NOTICE!
Tensile forces can lead to damage and malfunctions on the on-
load tap-changer. Using spacers, insert on-load tap-changer vertically into
supporting structure (maximum 1° deviation from the vertical) so that the
on-load tap-changer reaches its final installation height and only has to be
raised a maximum of 5 to 20 mm after fitting the bell-type tank.
Figure 42: Supporting structure
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......