5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
88
4349322/01 EN
VACUTAP
®
VV
®
5. Position the wire for the terminal box cover and affix using the slotted
head screw.
Figure 79: Terminal box cover
6. Attach the terminal box cover and secure with screws.
Figure 80: Terminal box cover
5.4.3.2 Installing protective relay in piping
Ensure the following for installation and proper function of the protective re-
lay:
1. Ensure that there are no foreign bodies in the piping or in the oil conserva-
tor.
2. Install protective relay such that it can be easily accessed for subsequent
maintenance work.
3. Install protective relay with good support and free from vibrations.
4. The test buttons must be at the top.
5. The interior diameter of the piping must be at least 25 mm.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......